Quickhang installation kits take things a step further and provide all the hooks brackets and nails plus all the ceiling grid and wall molding you ll need to cover approximately 64 sq.
Armstrong suspended ceiling installation guide.
1 draw the room to scale.
How to install your armstrong suspended ceiling install grid prepare and hang main beams to prepare the first main beam trim the end of the main beam so that a cross tee slot on the main beam is the border panel distance from the wall b.
Continue to insert all other.
Pdf installation instructions acoustaffix surface mount ceiling panels 900k.
Nail wall molding to the wall studs c.
Install the first main beam install the first section of main beam.
This creates the proper border tile opening tip.
Bend the wire up and wrap it around itself three times.
Pdf installation instructions 480 plank 225k.
Pdf installation instructions 15 16 and 9 16 grid 719k.
Cut the end so that a cross tee route hole is located the border distance in from the end wall insert a hanger wire into a hanger wire hole near the other end of the main beam.
Add height of wall molding and mark a level line around 3 walls b.
Full length main tees bold lines are spaced 4 on center o c as measured from the center of one tee to the center of the next with 4 cross tees installed perpendicular 2 o c.
The minimum plenum height from the ceiling slab should not be less than 100mm for lay in system.
Ceiling panels are sold separately these convenient kits make installing a drop ceiling an easy diy project.
Cut the top of the grid first with tin snips and then.
Instructions can be found at the end of this overview.
Pdf installation instructions 12 x 12 260k.
Suspended ceiling for 2 x 4 ceiling panels.
Ceiling installation decorative ceiling or wall installation doesn t have to be daunting.
The reference ceiling level should be established by the main contractor with the help of all other services vendors.
Mark height desired for new ceiling a.
If nailing molding directly to wall is not possible for example a.
Panels may be stored in areas with a temperature between 60 and 80 f.
Measuring the ceiling height is the most crucial stage before commencing installation.
Read complete installation instructions before beginning your installation.
Unpack all panels at least 24 hours prior to installation.